PROJECT SCHEDULING ANALYSIS USING PRECEDENCE DIAGRAM METHOD (PDM)
Abstract
Many obstacles that affect the completion of the project late, like: weather, late general plan approval, late material arrival, less skills and others. The Precedence Diagram Method is the method used to create network planning especially project scheduling. This research will examine how to plan the proper project scheduling of Pressure Vessel project of PT Wika Technip which is done by PT. Barata Indonesia by using PDM.The results obtained from the cost calculation at 252 days of project life have total project cost of Rp.6.131.093.885,00 and at project age 243 days total project cost is Rp.6.236.994.056,00. In this case it is known that there is an increase in total cost of Rp.105.900.171,00 and the time difference of 9 days when the acceleration is done on the project duration from 252 days to 243 days.
Keywords
Full Text:
PDFReferences
Frederika, A. Analisis Percepatan Pelaksanaan dengan Menambah Jam Kerja Optimum Pada Proyek Konstruksi. Skripsi Jurusan Teknik Sipil, Fakultas Teknik, Universitas Udayana Denpasar; 2010
Murahartawaty. Metode Jalur Critical. Sekolah Tinggi Teknologi Telkom; 2012
Nugraha, dkk. Manajemen Proyek 2. Surabaya: Kartika Yudha; 1986
Ridho, M. R dan Syahrizal. Evaluasi Penjadwalan Waktu dan Biaya Proyek dengan Metode CPM dan PERT. Skripsi Jurusan Teknik Sipil, Universitas Sumatera Utara; 2014
Soeharto, I. Manajemen Proyek dari Konseptual sampai Operasional. Jakarta: Erlangga; 1995
Soekoco, I. Analisa Pengaruh Time Cost Trade Off Pada Pembangunan Struktur Atas Jembatan Kali Surabaya Di Mojokerto. Skripsi Jurusan Manajemen, Fakultas Ekonomi, Universitas Komputer Indonesia; 2014
Sulistyoningrum, V. Analisis Pengaruh Percepatan Instalasi Hull Outfittings Dalam Pembangunan Marine Disanter Prevention Ship dengan Penerapan Critical Path Method.
Skripsi Jurusan Teknik Kelautan, Fakultas Teknik Kelautan, Institut Teknologi Sepuluh Nopember; 2013
Tualaka, J. M. Penjadwalan Flow Shop dengan Alogaritma Ant-Colony Optimization untuk Meminimasi Makespan di Departement Spinning III PT. Grandtex Textil Indonesia. Tugas AkhirJurusan Teknik Industri, Fakultas Teknik dan Ilmu Komputer, Universitas Komputer Indonesia; 2006
Verzuh, E. The Fast Forward MBA in Project Management. Wiley; 2011
DOI: https://doi.org/10.21776/ub.jemis.2018.006.01.5
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.